Nanisivik Mine

Mineclosure.com team members provided closure design services for final closure of the Nanisivik lead-zinc Mine at 73°N in northern Canada including the following significant tasks:

bullet

Final design, preparation of closure plan and permitting (2001 to 2003).

bullet

Field engineering and construction supervision (2004 to present).

bullet

Preparation of as-built reports and performance monitoring (2007 to present).

 

More Details

Discovery Mine

bullet

Permafrost degradation and reclamation strategy for borrow pit constructed in degrading permafrost. Risk assessment and options analyses were undertaken to scope potential options for remediation.

bullet

Long-term performance of a previously-constructed tailings cover and remediation measures implementation.

bullet

Crown pillar investigation and stability assessment.

bullet

Investigation and design of concrete seals for selected mine openings.

 

More Details

Faro Mine

Part of an overall mine closure team representing engineering and environmental considerations for closure. We participated in numerous planning sessions, scoping studies of options and alternatives, cost-estimating of options and risk assessments regarding dams, tailings, diversion channels and waste dumps. Provided detailed assessment of rock drain hydraulic design and stability undertaken. Also undertook the design, permitting and implementation of the controlled breach and decommissioning of a water retention dam at the Faro site. This dam breaching project was only the second such project undertaken in Canada to-date.

 

More Details

Cantung

bullet

Western World’s Largest Tungsten

bullet

Geochemical Characterization of Mine Rock

bullet

Evaluation of the environmental geochemistry of mine rock associated with underground workings, open pit and waste rock dumps in order to provide long-term management of mine rock material.

 

More Details

Highland Valley Copper

Regional landfill proposed on a waste rock and overburden dump at the Highland Valley copper/molybdenum mine with a capacity of 50 million tons of municipal solid waste from throughout southwestern British Columbia .

 

More Details

Mt. Whaleback Mine

Development of a cover system for acid generating overburden using the moisture store-and-release design concept. Field performance confirmed through large-scale cover system field trials. Detailed cover system performance monitoring has been in place since 1997.

 

More Details

Whistle Mine

Approximately 7 m tonnes of acid-generating waste rock was relocated to the open pit at CVRD Inco's Whistle Mine near Sudbury, ON, Canada. A multi-layer earthen cover system was constructed over the backfilled pit, primarily to limit the ingress of atmospheric oxygen to the underlying waste rock. Instrumentation was installed during construction of the cover system to facilitate evaluation of its performance over time under site-specific climate conditions. 

More Details

 